Temperature and Relative Humidity Monitoring at Packaging Area

Temperature and Relative Humidity Monitoring, Purpose: Temperature and Relative Humidity Monitoring, To lay down the procedure for monitoring of Temperature & Relative Humidity (%) at the Packaging area. Temperature and Relative Humidity Monitoring, Scope: This SOP is applicable for the Packaging Area of XX Pharmaceuticals Limited. Definitions / Abbreviation: N/A. Responsibilities: [][]The Roles and Responsibilities […]


Temperature and Relative Humidity Monitoring, Purpose:

Temperature and Relative Humidity Monitoring, To lay down the procedure for monitoring of Temperature & Relative Humidity (%) at the Packaging area.

Temperature and Relative Humidity Monitoring, Scope:

This SOP is applicable for the Packaging Area of XX Pharmaceuticals Limited.

Definitions / Abbreviation:

N/A.

Responsibilities:

[][]The Roles and Responsibilities are as follows :

Operator

[][]To follow the laid down procedure

Executive, Packaging

[][]To monitor and check the procedure is followed

Manager, Production

[][]To implement this correctly

Manager, Quality Assurance

[][]To approve the Document

Annexure:

N/A.

Procedure :

Precaution :

[][]Do not use a new hygrometer unless it is calibrated.
[][]When any hygrometer is shifted from one location to another, allow to stabilize the device prior to record the temperature / Relative Humidity (%).
[][]Check the due date of calibration of the hygrometer and magnehelic gauge before taking reading.
[][]Ensure that temperature and Relative Humidity (%) readings are taken before going to operation.
[][]Temperature and Relative Humidity (%) (using Digital Hygrometer)
[][]Ensure that no dust is accumulated over the sensor.
[][]Read the temperature and relative humidity (%) values displayed on the screen of digital hygrometer and record.

Area

[][]Packing Hall, Waste, Cleaner’s, Printing, IPC Room, Office Executive and Packing Material Staging.

Temperature

[][]NMT 25°C

Relative Humidity (%)

[][]NMT 60 %

Frequency

[][]Twice in a shift, first before starting the operation and second after four hours.
[][]If the reading is not within limit at any time of operation, inform the Engineering department immediately.


Leave a Comment

Your email address will not be published. Required fields are marked *

error: Content is protected by www.pharmaguideline.co.uk !!