Water Purification System Operation

Water Purification System, Purpose : Water Purification System, This purpose of this SOP is to describe the operation of Water Purification System (Model: Barnstead Easy Pure II 7136). Water Purification System, Scope : This procedure is applicable for Water Purification System (Model: Barnstead Easy Pure II 7136), installed in the quality control laboratory  of XX […]


Water Purification System, Purpose :

Water Purification System, This purpose of this SOP is to describe the operation of Water Purification System (Model: Barnstead Easy Pure II 7136).

Water Purification System, Scope :

This procedure is applicable for Water Purification System (Model: Barnstead Easy Pure II 7136), installed in the quality control laboratory  of XX Pharmaceuticals Limited.

Definitions / Abbreviation:

[][]SOP: Standard Operating Procedure
[][]QC: Quality Control

Responsibilities:

The roles and responsibility is as follows:

Executive/ Sr. Executive, QC

[][]Ensure that the instructions of this procedure are correctly followed

Manager, Quality Control

[][]Ensure that this procedure is kept up to date.
[][]Ensure appropriate personnel from the section are trained on this procedure.
[][]Ensure the instrument safety information is maintained as per manual.
[][]Ensure that the water system is ready for use.
[][]Ensure that the water system is sanitized properly at due time.
[][]Confirm that SOP is technically sound and reflects the required working practices.

Head of Quality Assurance

[][]Approval of the SOP
[][]To ensure the overall implementation of the SOP.

Annexure:

N/A

Procedure:

General precaution:

[][]Use a properly grounded electrical outlet of correct voltage and current handling capacity.
[][]Do not locate your EASY pure II directly over equipment that requires electrical service. Routine maintenance of this unit may involve water spillage and subsequent electrical shock hazard, if improperly located.
[][]Replace fuses only with the same type and rating of fuse.
[][]Do not assemble water lines or remove cartridges where spilled water could contact equipment that requires electrical service. Electrical shock could result.
[][]Disconnect from the power supply prior to maintenance and servicing.
[][]Does not use in the presence of flammable or combustible materials; fire or explosion may result. This device contains components which may ignite such materials.
[][]Do not use in the presence of highly corrosive substances such as bleach or acid baths; fire may result.
[][]This device is to be used with water feeds only. Cleaning agents must be used in compliance with instructions in this manual. Failure to comply could result in explosion and personal injury.
[][]Avoid splashing cleaning solutions on clothing or skin.
[][]Ensure all piping connections are tight to avoid chemical leakage.
[][]Ensure adequate ventilation.
[][]Carefully follow manufacturer’s safety instructions on labels of chemical containers and material safety data sheets.
[][]Depressurize system prior to opening cartridge access door or removing top cover.
[][]This unit may be equipped with an ultraviolet lamp. Ultraviolet radiation is harmful to the eyes and skin. Do not observe the lamp directly.

Operation:

[][]Turn main power on at power entry module.
[][]Switch on the Water Purification System located on the upper left side of the instrument.
[][]The Barnstead EASY pure II 7136 control panel incorporates three switches ‘STOP’,’STAND BY’, ‘START’ and a digital display.
[][]Connect the instrument with purified water supply by feed water tubing.
[][]Pressing the ‘START’ when the unit is in either the stop or standby mode will put the instrument into Run Mode.
[][]When the display will show the resistivity 18.2 MΩ-cm at 25°C, the water can be taken from the instrument for different purposes by pushing down the Draw-off Valve Lever.
[][]To reserve the RO water for further use, connect the Water purification system with Barnstead 30 liter Storage reservoir with water inlet tubing.
[][]Push down the Draw-off Valve Lever to transfer the RO water from Water purification system to Barnstead 30 liter Storage reservoir by water inlet tubing.
[][]Use the water from the Barnstead 30 liter Storage reservoir for different purposes by Draw Off Valve.
[][]Use Product water outlet to drain the RO water if necessary.
[][]Finally power off Water Purification System.
[][]Unplug the instrument from the main power connection.


Leave a Comment

Your email address will not be published. Required fields are marked *

error: Content is protected by www.pharmaguideline.co.uk !!